Public benefits & costs study of the proposed BNSF/UP Front Range railroad infrastructure
rationalization project: final report.
Downloaded from the Colorado Department of Transportation website.
TRA1.2/B43/2005/INTERNET
- Final Report (PDF)
- Technical Memorandum 1, Project Management Plan (PDF)
- Technical Memorandum 2, Study Approach Statement (PDF)
- Technical Memorandum 3, Public Involvement Plan (PDF)
- Technical Memorandum 4, Data Collection and Evaluation (PDF)
- Technical Memorandum 4, figures (PDF)
- Technical Memorandum 4, tables 4.2.1 - 4.2.18 (PDF)
- Technical Memorandum 4, tables 4.5.1 and 4.5.2 (PDF)
- Technical Memorandum 5 (PDF)
- Technical Memorandum 5, appendices (PDF)
- Technical Memorandum 6, Additional Railroad Project Impacts (PDF)
- Technical Memorandum 7, Public Benefits of Potential Future Passenger Rail (PDF)
- Technical Memorandum 8, Funding and Financing Strategies (PDF)
- Technical Memorandum 9, Study Findings and Recommendations (PDF)